| Deliverables |
D1.1 Definition of ATM environment for UAS in 2020  |
D1.1 Definition of the environment of civil UAS applications
DFS
Deliverable
INOUI-WP1.1-DFS-D1.1-PU-v1.0
|
29-02-2008 |
FINAL |
1352.97 |
|
D1.2 Definition of operational concepts for UAS  |
Concept for Civil UAS Applications
DFS
Deliverable
INOUI-WP1.1-D1.2-DFS-PU-V1.0
|
23-03-2009 |
FINAL |
1056.85 |
|
D1.3 Proposal for the Integration of UAS into the airspace  |
D1.3 PROPOSAL FOR THE INTEGRATION OF UAS INTO THE
Stefan Tenoort DFS
Deliverable
INOUI-WP1.3-D1.3-DFS-PU-V1.0
|
04-06-2009 |
FINAL |
860.53 |
|
Executive Summary - D1.3 Proposal for UAS integration
Stefan Tenoort - DFS
Deliverable
INOUI-WP1.3-DFS-Excutive Summary
|
04-06-2009 |
FINAL |
107.26 |
|
Executive Summary - Feedback Form
Stefan Tenoort
Deliverable
INOUI-WP1.3-DFS-Feedback_Form
|
04-06-2009 |
FINAL |
126.5 |
|
D1.4 Harmonized proposal for the Integration of UAS  |
Harmonized Proposal for the Integration of UAS
DFS
Deliverable
INOUI-WP1.4-D1.4-DFS-PU-V1.0.pdf
|
02-03-2010 |
FINAL |
1003.8 |
|
D2.1 Technology watch  |
D2.1 Report on Technology Systems Solutions
Stefan Tenoort / DFS
Deliverable
INOUI-WP2.1-DFS-D2.1-PU-V11 final
|
26-05-2009 |
FINAL |
1137.28 |
|
D2.2 Assessment of the Technology for UAS Integration  |
WP2.2 Assessment of Technology for UAS Integration
ISD
Deliverable
INOUI-WP2.2-ISD-PU-D2.2-v1.0
|
25-08-2009 |
FINAL |
649.29 |
|
D2.3 Conclusions and Recommendations for Technological Developments  |
CONCLUSIONS AND RECOMMENDATIONS ON NEW TECHNOLOGICAL DEVELOPMENTS
ISD
Deliverable
INOUI-WP2.3-BRT-D2.3-PU-V1.0.pdf
|
02-03-2010 |
FINAL |
561.03 |
|
D3.1 Regulatory Aspects for UAS Operations, Operators and Personell Qualification  |
Regulatory Aspects for UAS Operations, Operators and Personnel Qualification
ISD
Deliverable
INOUI-WP3.1-ISD-D3.1-PU-V1.0.pdf
|
28-08-2009 |
FINAL |
818.42 |
|
D3.2 UAS certification  |
D3.2 UAS CERTIFICATION
Antoine Joulia & Claude Le Tallec ONERA
Deliverable
INOUI-WP3.2-ONE-D3.2-PU-v1.0
|
28-05-2009 |
FINAL |
429.68 |
|
D3.3 Regulatory Roadmap for UAS integration in SES  |
Regulatory Roadmap for UAS Integration in SES
ISD
Deliverable
INOUI-WP3.3-ISD-D3.3-PU-v1.0.pdf
|
02-03-2010 |
FINAL |
2072.12 |
|
D4.1 UAS within the 2020 ATM SWIM-enabled ATM  |
INOUI WP4 D4.1 UAS WITHIN THE 2020 ATM SWIMENABLED
Carlos Montes BRTE
Deliverable
INOUI-WP4 1-BRT-D-UAS in a SWIM enabled environmen
|
25-05-2009 |
FINAL |
2428.36 |
|
D4.2 New UAS-related Common Operating Picture Actors  |
New UAS- related COP actors
BRT
Deliverable
INOUI-WP4.2-BRT-D4.2-PU-v1.0
|
25-08-2009 |
FINAL |
1169.37 |
|
D4.3 Operations depending on the Level of Automation and Autonomy  |
UAS OPERATIONS DEPENDING ON THE LEVEL OF AUTOMATION & AUTONOMY
BRT
Deliverable
INOUI-WP4.3-BRT-D4.3-PU-V1.0.pdf
|
02-03-2010 |
FINAL |
603.9 |
|
D5.0 Scope of Risks and Qantified Safety Criteria  |
D5.0 Scope of Risks and Quantified Safety Criteria
Hans de Jong & Rodrigo Priego
Deliverable
INOUI-WP5-D5.0b-DFS-PU-V20
|
21-05-2009 |
FINAL |
570.87 |
|
D5.0A Safety Criteria - Scope of Risks
DFS/ISD
Deliverable
INOUI-WP5.0-DFS/ISD-D5.0a-SOR-PU-v1.0
|
15-12-2008 |
FINAL |
493.66 |
|
D5.1 System Description for Safety Analysis  |
System Description for Safety Analysis
BRT
Deliverable
INOUI-WP5.1-BRT-D5.1-PU-V2.0
|
25-08-2009 |
FINAL |
266.38 |
|
D5.2 Functional Hazard Analysis  |
Scope of Risks & Quantified Safety Criteria
DFS
Deliverable
INOUI-WP5.2-DFS-D5.2-PU-V1.0
|
19-10-2009 |
FINAL |
859.12 |
|
D5.3 Towards Safety Requirements for the Integration of UAS  |
TOWARDS SAFETY REQUIREMENTS FOR THE INTEGRATION OF UAS IN NON-SEGREGATED AIRSPACE
ONE_DFS
Deliverable
INOUI-WP5.3-ONE-DFS-D5.3_PU_V1.0.pdf
|
19-01-2010 |
FINAL |
491.71 |
|
D5.5 Interpretation of Safety Analysis Results in the Context of SESAR  |
INTERPRETATION OF THE SAFETY ANALYSIS RESULTS IN THE CONTEXT OF SESAR
DFS
Deliverable
INOUI-WP5.5-DFS-D5.5.v1.0
|
10-05-2010 |
FINAL |
277.05 |
|
D5.4 Aerodrome Safety Analysis  |
AERODROME SAFETY ANALYSIS
ISD
Deliverable
INOUI-WP5.4-ISD-D5.4_PU_V1.0.pdf
|
19-01-2010 |
FINAL |
1432.49 |
|
D6.1 Operational Concept for the UAS in the Airports  |
NEW AERODROME CONCEPTS FOR UAS
ISD
Deliverable
INOUI-WP6.1-ISD-D6.1-PU-V1.0.pdf
|
02-03-2010 |
FINAL |
1694.18 |
|
D6.2 Technology Watch for UAS Operations in the Airports  |
TECHNOLOGY WATCH FOR UAS OPERATIONS IN AIRPORTS
BRT
Deliverable
INOUI-WP6.2-BRT-D6.2-PU-V1.0.pdf
|
10-06-2010 |
FINAL |
732.72 |
|
WP7.4 INOUI UAS Terms & Terminology List  |
INOUI UAS Terms and Terminology
DFS
Deliverable
INOUI-WP7-DFS-TERMS-V1.1
|
16-10-2009 |
FINAL |
100.57 |
|
WP7.5 INOUI Booklet  |
INOUI Booklet_Printing file_January 2010
DFS
Deliverable
INOUI-WP7.5-DFS-Booklet_V1.0
|
19-01-2010 |
FINAL |
1140.52 |
|
WP7.6 Executive Summaries  |
INOUI WP1 Executive Summary
DFS
Deliverable
INOUI-WP7-DFS-O-PU-v1.0
|
30-06-2010 |
FINAL |
275.94 |
|
INOUI WP2 Executive Summary
ISD
Deliverable
INOUI-WP7-ISD-O-PU-v1.0
|
30-06-2010 |
FINAL |
211.45 |
|
INOUI WP3 Executive Summary
ISD
Deliverable
INOUI-WP7-ISD-O-PU-v1.0
|
30-06-2010 |
FINAL |
437.55 |
|
INOUI WP4 Executive Summary
BRT
Deliverable
INOUI-WP7-BRT-O-PU-v1.0
|
30-06-2010 |
FINAL |
374.73 |
|
INOUI WP5 Executive Summary
DFS
Deliverable
INOUI-WP7-DFS-O-PU-v1.0
|
30-06-2010 |
FINAL |
199.69 |
|
INOUI WP6 Executive Summary
ISD
Deliverable
INOUI-WP7-ISD-O-PU-v1.0
|
30-06-2010 |
FINAL |
219.53 |
|